Optimal production planning of wind and thermal power plants with respect to constraints on transmission line and taking into account the uncertainty of wind
作者: Ali Taimori fard Rahim Ildarabadi and Mahmoud Zadehbagheri
刊名: International Journal of Advanced Computer Research (IJACR), 2015, Vol.5 (18)
来源数据库: ACCENTS
关键词: Firefly algorithmoptimal productiontransmission line constraintsproduction managementthermal power plant.
原始语种摘要: Diversity and multiplicity of factors affecting the exploitation from power systems, makes completely impossible to solve this problem. Therefore, the optimal planning problem in system exploitation is decomposed into several sub-problems. One of exploitation sub-problems from power systems is economic dispatch of production on system units in order to meet the consumption needs. This is an optimization problem in real power systems, with great dimensions and multiple constraints including economic dispatch of system, transfer network restrictions, rate of increase and decrease in production, prohibited areas of operation units, spinning reserve storage of systems, loading effects of steam valves, multi-fuel production units. A suitable algorithm based on probabilistic search methods has...
全文获取路径: PDF下载  ACCENTS  (合作)
分享到:

×
关键词翻译
关键词翻译
  • production 生产
  • uncertainty 不定
  • system 
  • proposed 建议的
  • power 功率
  • planning 计划
  • problem 题目
  • units 部件
  • consumption 消耗
  • great 大的