Assessing the influence of project management on quality during the early phases of construction projects
作者: Žanesa LjevoMladen VukomanovićSuada Džebo
作者单位: 11 University of Sarajevo, Faculty of Civil Engineering Sarajevo , BOSNIA AND HERZEGOVINA
22 University of Zagreb, Faculty of Civil Engineering, Kačićeva ul. 26, 10000, Zagreb , Croatia
33 University of Sarajevo, Faculty of Civil Engineering, Obala Kulina bana 7/II, Sarajevo 71000, Bosnia and Herzegovina
刊名: Organization, Technology and Management in Construction: an International Journal, 2018, Vol.9 (1), pp.1584-1592
来源数据库: De Gruyter Journal
DOI: 10.1515/otmcj-2016-0029
关键词: Construction projectKey quality factorProduct quality indicatorsModeling results
原始语种摘要: Abstract Although the quality of a process affects the quality of the end product, there is currently an insignif­icant amount of knowledge about the quality of project management (PM) processes that directly affect the quality of the delivered product (constructed building). This study presents a proposal for modeling the impact of the quality of the PM process on the quality of the con­structed building. The quality of the PM process is rep­resented by the main quality factors and product quality indicators. It presents the results of the interviews that were conducted and study cases that were analyzed in Bosnia and Herzegovina with a variety of project partici­pants (with different managerial perspectives) in terms of the indicators of quality of the delivered product. All...
全文获取路径: De Gruyter  (合作)
分享到:

×
关键词翻译
关键词翻译
  • quality 品质
  • construction 构造
  • management 管理
  • project 凸出
  • process 过程
  • managerial 经理的
  • indicators 指示器
  • during 在的期间
  • product 产物
  • Construction 建筑物