Identifying Issues of Change Leading to Cost Conflicts: Case Study in Cambodia
作者: Vachara PeansupapLakhena Cheang
作者单位: 1Assistant Professor, Department of Civil Engineering, Faculty of Engineering, Chulalongkorn University, Bangkok 10330, Thailand
2Graduate student, Department of Civil Engineering, Faculty of Engineering, Chulalongkorn University, Bangkok 10330, Thailand
刊名: Procedia Engineering, 2015, Vol.123 , pp.379-387
来源数据库: Elsevier Journal
DOI: 10.1016/j.proeng.2015.10.050
关键词: Cambodiachange issuescontractorcost conflictowner
原始语种摘要: Abstract(#br)It is impossible to avoid changes in construction projects. Construction changes have minor and major effects on the success of a project, particularly on its cost. A detailed study of change is needed to alleviate such effects on project cost. This paper introduces the identification of specific change issues regarding costs that may lead to conflicts between the owner and the contractor of a project. Such identification would help project practitioners be aware of change issues and manage them effectively as well as open up alternative viewpoints of change by the two parties. To achieve the research objective, a 16-item questionnaire with a five-point Likert scale was conducted to collect the necessary information. The data were collected from respondents in Cambodian...