The multi-mode resource-constrained project scheduling problem with generalized precedence relations
作者: Bert De ReyckWilly Herroelen
作者单位: 1London Business School, Sussex Place, Regent's Park, London NW1 4SA, UK
2Department of Applied Economics, Katholieke Universiteit Leuven, Naamsestraat 69, B-3000 Leuven, Belgium
刊名: European Journal of Operational Research, 1999, Vol.119 (2), pp.538-556
来源数据库: Elsevier Journal
DOI: 10.1016/S0377-2217(99)00151-4
关键词: Project managementPlanning and schedulingGeneralized precedence relationsMultiple activity modesHeuristicsLocal searchTabu search
原始语种摘要: Abstract(#br)In this paper, we tackle the challenging problem of scheduling activities to minimize the project duration, in which the activities (a) are subject to generalized precedence relations, (b) require units of multiple renewable, non-renewable and doubly constrained resources for which a limited availability is imposed, and (c) can be performed in one of several different ways, reflected in multiple activity scenarios or modes. These multiple modes give rise to several kinds of trade-offs (time/resource, time/cost and resource/resource trade-offs) which allow for a more efficient allocation and use of resources. We present a local search-based solution methodology which is able to handle many real-life project scheduling characteristics such as time-varying resource requirements...
全文获取路径: Elsevier  (合作)
分享到:
来源刊物:
影响因子:2.038 (2012)

×
关键词翻译
关键词翻译
  • scheduling 
  • generalized 广义
  • resource 资源
  • relations 性行为
  • constrained 约束
  • project 凸出
  • allocation 分配
  • activity 活度
  • minimize 最小化
  • duration 持续时间