Investment risk assessment of coal-fired power plants in countries along the Belt and Road initiative based on ANP-Entropy-TODIM method
作者: Jiahai YuanXinying LiChuanbo XuChanghong ZhaoYuanxin Liu
作者单位: 1School of Economics and Management, North China Electric Power University, Beijing, 102206, China
2Beijing Key Laboratory of New Energy and Low-Carbon Development (North China Electric Power University), Changping Beijing, 102206, China
刊名: Energy, 2019, Vol.176 , pp.623-640
来源数据库: Elsevier Journal
DOI: 10.1016/j.energy.2019.04.038
关键词: Belt and Road initiativeCoal-fired power plantsRisk assessmentAnalytic network processEntropyAn acronym in Portuguese for interactive multi-criteria decision making
英文摘要: Abstract(#br)Coal is an irreplaceable part of the world energy structure and the condition will not be changed in the near future. Under the Belt and Road initiative, more and more Chinese energy enterprises are planning to invest in coal-fired power plant (CFPP) abroad. However, there are multiple potential risks in investing in CFPP overseas. So, assessing the risk level can help the investors avoid too risky countries and at the same time facilitate the government to take measures to reduce the potential risks to attract more investors. To reasonably assess overseas investment risk of CFPP in countries along the Belt and Road initiative, this paper establishes an evaluation criteria system from eight dimensions which consists of a total of 39 criteria. Then, these criteria weights are...
全文获取路径: Elsevier  (合作)
分享到:
来源刊物:
影响因子:3.651 (2012)

×
关键词翻译
关键词翻译
  • initiative 首创精神
  • assessment 评价
  • fired 发火
  • ANP Air Navigation Plan
  • based 基于
  • power 功率
  • along 沿着
  • method 方法