Monte Carlo Simulation and Modeling of Schedule, Cost and Risks of Dasu Hydropower Project
作者: Sajjad MubinShah JahanEkaterina Gavrishyk
刊名: Mehran University Research Journal of Engineering and Technology, 2019, Vol.38 (3), pp.557-570
来源数据库: Mehran University of Engineering and Technology
原始语种摘要: HPP (Hydropower Projects) are very complex and risky in nature. For HPP, it is extremely important not only to identify risks but also to adopt proper mitigation measure to complete the project with in defined schedule and budget. Attempt has been made in this paper to identify critical risks associated with Dasu HPP and their mitigation measure to complete the project within predefined time and budget. The research methodology involved the questionnaire survey for identification of potential risks with their probabilities and impact. Pert-Master (Oracle Risk) software was used for simulation purposes. After feeding all data in the software, Monte Carlo simulation was run at 1,000 iterations to generate most probable duration of project, most probable cost of the project, critical risks...
全文获取路径: PDF下载  Mehran University of Engineering and Technology 
分享到:

×
关键词翻译
关键词翻译
  • budget 预算
  • risky 危险
  • schedule 负载图表
  • methodology 方法学
  • planned 计划的
  • critical 临界的
  • project 凸出
  • their 他们的
  • successful 成功的
  • measure 测度