Considerations for Filing Global Construction Claims: Legal Perspective
全球工程索赔的法律思考
作者: Farah DemachkiehSalam KhalifeMohamed-Asem Abdul-MalakFarook Hamzeh
作者单位: 1American Univ. of Beirut
2Univ. of Alberta
刊名: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 2020, Vol.12 (3)
来源数据库: The American Society of Civil Engineers Journal
DOI: 10.1061/(ASCE)LA.1943-4170.0000393
原始语种摘要: AbstractDelays and disruptions that frequently lead to cost overruns on, and late completion of, construction projects are often accompanied by claims for time extensions and/or additional compensations by construction contractors. To this effect, contractors’ claims can become complex to an extent where it is difficult to relate losses incurred to individual events or causes and thereby establish grounds for putting forward global claims. The foundation of this category of claims is that multiple claim-causing events, for which the owner is responsible, have composite implications that render the determination of explicit individual cause-effect relations impossible or impracticable. As such, the aim of the work presented in this paper is to identify and synthesize the conditions that...
全文获取路径: ASCE 
分享到:

×
关键词翻译
关键词翻译
  • claims 赔偿金
  • success 成功
  • construction 构造
  • Construction 建筑物
  • impossibility 不可能
  • review 复审
  • contractor 承包商
  • moderating 减速的
  • methodology 方法学
  • responsibility 责任