Review and Survey of 4D Simulation Applications in Forensic Investigation of Delay Claims in Construction Projects
4D仿真在工程延期索赔司法鉴定中的应用综述
作者: Michel GuévremontAmin Hammad
作者单位: 1Hydro-Québec
2Concordia Univ.
刊名: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 2020, Vol.12 (3)
来源数据库: The American Society of Civil Engineers Journal
DOI: 10.1061/(ASCE)LA.1943-4170.0000391
关键词: 4D simulationDelay claimsConstructionBuilding information modeling (BIM)
原始语种摘要: AbstractFour-dimensional (4D) simulation is not frequently used in courtrooms because it is considered costly, complex, and risky. The experience in litigation systems reveals that many expert witnesses at present are not familiar with 4D simulation and are reserved about using technology. The objectives of this article are to discuss the efficiency and value of 4D simulation in construction claims as a tool for supporting legal arguments, stakeholder’s viewpoints, and interrogatory considerations. In delay claims, conventional methods, tools, and 4D simulation concepts were used. The case study considered the appropriate level of development (LOD) for claims: summary for the full scope, and detailed for event specific information. This case study was presented to seven lawyers. A survey,...
全文获取路径: ASCE 
分享到:

×
关键词翻译
关键词翻译
  • claims 赔偿金
  • Construction 建筑物
  • construction 构造
  • information 报告
  • litigation 起诉
  • risky 危险
  • costly 昂贵的
  • simulation 模拟
  • contractual 合同
  • discuss 议论