CONSTRUCTION OPTIMIZATION OF HOT WATER FIRE-TUBE BOILER USING THERMOMECHANICAL FINITE ELEMENT ANALYSIS
作者: Milena N. Rajić Milan S. Banić Dragoljub S. Živković Miša M. Tomić Marko V. Mančić
刊名: Thermal Science, 2018, Vol.22 (Supplement5), pp.S1511-S1523
来源数据库: Society for Thermal Engineers of Serbia
DOI: https://doi.org/10.2298/TSCI18S5511R
关键词: Hot water boilerFinite element analysisThermomechanical analysisKriging response surface optimization
原始语种摘要: Exploitation experience of hot water boiler plants indicates relatively frequent and permanent breakdowns resulting from the accident state of various elements of the boiler. In addition to the damages caused by the corrosion processes and inadequate management of the plant, the phenomena of fatigue of boiler elements exposed to high pressures and temperatures can occur. Due to high pressure and temperature certain boiler elements are exposed to, high strain and stress of these elements can eventually lead to breakdowns. In this paper, a hot water fire tube boiler, produced by "Minel-Kotlogradnja" Belgrade, type TE110V, installed within the plant "Technical Faculties" at Faculty of Mechanical Engineering in Nis, Serbia, is analyzed. Thermomechanical stress-strain analysis is performed...
全文获取路径: PDF下载  塞尔维亚热力工程师协会 
分享到:

×
关键词翻译
关键词翻译
  • functional 功能的
  • typically 典型地
  • elements 初步
  • analysis 分析
  • investigate 
  • strain 应变
  • boiler 锅炉
  • addition 添加
  • inadequate 不够
  • dependence 从属